phase, phase 1, phase 2, brownfield, environmental, environmental site
assessment, site assessment, assessments, ESA, due diligence, all appropriate inquiry, AAI, consultant, consultants, remediation,
gasoline, oil, remediation services, geologist, geologists, geology, site, groundwater, water wells, underground storage tank, UST,
cleanup, soil, petroleum, ground water, contamination, groundwater pollution, groundwater remediation, hazardous materials,
quarterly, monitoring, LBP, lead paint, lead based paint, lead-paint, abatement, removal, ACM, asbestos, mesothelioma, asbestosis,
abate, encapsulation, abestos abatement, contractor, contractors, asbestos survey, ceiling, popcorn ceiling, auccoustical ceiling,
contractors, demolition, fibers, friable, non-friable, nonfriable, hazard, identifying, inspection, inspections, insulation, management,
plaster, removal companies, asbestos sampling, sampling, test, testing, chrysotile, actinolite, crociderite, tremolite, construction,
abatement contractors, air sampling, TPH
     
 
 
 
  QUICK LINKS:

> Phase I Assessments

> Phase II Investigations

> Phase III Remediation

> Asbestos Surveys

> Asbestos Abatement

> Lead-Based Paint Surveys

> Lead-Based Paint
          Abatement

> Statement of Qualifications

> Request a FREE QUOTE

Qualight Environmental is a Proud Sponsor of:

The Illumination Foundation

In partnership with:

The Asbestos &
Mesothelioma Center

  What can I do about Lead-Based Paint ?

It is important to keep in mind that only lead-based paint that has been damaged pose an immediate health risk. Lead-based paints that are not subject to water, wind, vibration, friction or other disturbance do not pose an immediate health risk, because paint chips or dust are not created. However, it is very important to deal with lead-based paint once it is identified.

  Four solutions are used to reduce the health risks of lead-based paint:

1) Temporary stabilization - painting over damaged paint surfaces,

2) Sealing - sealing of lead-based painted surfaces with specially formulated sealants,

2) Enclosure - the construction of a physical barrier over the lead-based painted areas, and

3) Abatement (removal) - the physical removal of the lead-based paint.

The last three solutions should only be performed by qualified workers trained in the removal of lead-based paint. Only a certified lead abatement contractor can assist you in determining which solution is most appropriate and cost effective.

What is the scope of work for a Lead-Based Paint Abatement ?

The objective of Lead-Based Paint Abatement is to ensure the proper removal and disposal of lead-base paint materials at your Property.

Prior to the abatement activities, a Property reconnaissance is performed to determine the amount and location of lead-based paint requiring removal and disposal. The reconnaissance is typically attended at the minimum, by a certified Lead-Related Inspector/Assessor and Construction Monitor, and a State-licensed, DHS and SCAQMD-registered lead abatement contractor.

A typical scope of work for a lead-based paint abatement consists of:

• Reviewing the abatement contractor’s submittals;

• Observing and documenting the abatement contractor’s work performance;

• Ensuring proper removal and disposal of lead-based paint and associated materials;

• Conducting visual inspections of the work area and engineering controls before, during, and after the abatement activities;

• Analyzing monitoring and clearance samples, and

• Assembling and submitting project documentation.

How much does a Lead-Based Paint Abatement cost ?

The cost to perform a Lead-Based Paint Survey or other solution is based on variables such as the extent and location of lead-based paint at your Property. Please contact us to discuss the different options available.

Please follow this link to contact us for ADDITIONAL INFORMATION, or contact us by phone at 310.383.1809.

     
Home    |    About Us    |    Certifications    |    Request a Quote    |    Contact Us